ECONOMIC AND METAMATHEMATICAL REPRESENTATION OF THE FUNCTIONING OF THE SYSTEM OF STRATEGIC CONTROL
https://doi.org/10.24412/2409-4358-2023-2-105-110
Abstract
An important result of strategic controlling is to ensure balanced and proportional growth, based on a common goal, and both internal and external influences must be taken into account. The higher the level of the hierarchy of investment and construction activities, the more the degree of complexity of the functions of management, control and decision-making increases. Investment and construction activity, as a technical and economic system, is a large complex of coordinated elements, interdependent within a more complex structure and logically forming a single whole, the management of which is carried out on the basis of the control actions established in the plan. The main and supporting processes and their complexes that occur in investment and construction activities and are determined by strategic and operational plans are determined by various flows of labor, raw materials, materials, energy, fixed assets and investments. On the other hand, the functioning of the system itself affects these flows.
About the Authors
S. B. SborshchikovRussian Federation
Sergey Borisovich Sborshchikov - Doctor of Economics, Professor, Head of the Department «Technology, Organization and Management in Construction»
129337, Central Federal District, Moscow, Highway Yaroslavskoe, 26
Scopus ID: 57192377091
D. M. Leibman
Russian Federation
Dmitry Mihailovich Leibman - Candidate of Economics
109428, Moscow, 2nd Institutskaya st., 6
References
1. Sborshchikov S. B. System technical description of the problem of differentiation between planning and current production activities in construction organizations // Bulletin of MGSU. 2011. V. 1. No. 1. S. 215 – 220;
2. Sborshchikov S. B. Organizational bases of sustainable development of energy construction // Vestnik MGSU 2010. No. 4. T. 2. P. 363-368;
3. Aleksanin A.V. Evaluation of the economic efficiency of the use of new technologies, materials and solutions in energy saving projects. Vestnik MGSU. 2009. No. S1. S. 164.
4. Volkov A. A., Losev Yu. G., Losev V K. Yu. Information support of the life cycle of construction objects // Vestnik MGSU. 2012. no. 11. S. 253-258;
5. Zharov Ya.V. Accounting for organizational aspects in the planning of construction production in the energy sector // Journal of PGS. 2013. No. 5. pp. 69-71;
6. Zhuravlev P.A. The price of construction and the stages of its formation // Bulletin of the Irkutsk State Technical University. 2015. No. 9 (104). pp. 174-178.
7. Lazareva N.V. Cost engineering as a basis for the integration of planning, financing and pricing processes in investment and construction activities. Vestnik MGSU. 2015. No. 11. P. 178-185.
8. Lazareva N.V., Zharov Ya.V. Mathematical description of information interaction in investment and construction activities. Vestnik MGSU. 2014. No. 5. P. 170-175.
9. Sborshchikov S. B. Theoretical foundations for building an organizational structure and decision-making in energy construction // Bulletin of the University (State University of Management). 2009. No. 10. P. 230;
10. Sborshchikov S. B. Theoretical foundations for the formation of new organizational schemes for the implementation of investment and construction projects in the energy sector based on the integration of engineering and logistics principles. Vestnik MGSU. 2009. No. 1. P. 146 150;
11. Sborshchikov S. B. Logistics of regulatory influences in the investment and construction sector (theory, methodology, practice) [Text] / Diss. doc. economy Sciences / Russian Academy of Economics. G. V. Plekhanov. Moscow, 2012.
12. Zhuravlev P.A., Klyuev V.D., Levchenko A.V. Methodical approach to the creation of information-analytical systems of cost monitoring in construction // Scientific Review. 2014. No. 1. P. 214-218;
13. Lyapin A.V., Analysis of the requirements for the pricing system in construction // Vestnik MGSU. 2012 No. 10. pp. 254-259;
14. Kantorovich L.V. , Mathematical methods of organization and planning of production // Application of mathematics in economic research. M.: Sotsekgiz, 1959. S. 235-275.
15. Dossick, G. Neff Messi talk and clean technology: communication, problem-solving and collaboration using Building Information Modelling // Engineering Project Organization Journal, 1(2), 2011. Online publication date: 1-Jun-2011. rr. 83-93.
16. Ginzburg V.M. Design of information systems in construction. Information Support . M. : DIA Publishing House, 2002. 320 p.
17. Mamedov Sh. M. Systematization of signs of competitiveness of a construction organization //Economic revival of Russia. 2010. no. 2. S. 24-28;
18. Zharov Ya.V. Organizational and technological design in the implementation of investment and construction projects. Vestnik MGSU. 2013. No. 5. S. 176-184;
19. Zhang J. P., Hu Z. Z. BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies // Automation in construction. 2011. Vol. 20. No. 2. S. 155-166;
20. Zhuravlev P.A., Klyuev V.D., Evseev V.G. Using a qualimetric approach to assess the competitiveness of investment construction projects // Scientific Review. 2014. No. 9. P. 209-214;
Review
For citations:
Sborshchikov S.B., Leibman D.M. ECONOMIC AND METAMATHEMATICAL REPRESENTATION OF THE FUNCTIONING OF THE SYSTEM OF STRATEGIC CONTROL. New technologies in construction. 2023;(2):41-46. (In Russ.) https://doi.org/10.24412/2409-4358-2023-2-105-110